Serrated Cutting
16.1 Cut and Drilled Sheet 1800 x 400 x 12 mm
Material shortage: stock and purchases do not cover the need
Beyond traditional APS: an AI-powered platform that unifies S&OP, S&OE, MRP, and finite shop-floor scheduling into one conversational ecosystem—centralized by a real-time Control Tower.
Sequencing rule
Direction
Go to
Bar colour
Bar label
| Order | Operation | Resource | Start | End | Need date | Status |
|---|
Serrated Cutting
16.1 Cut and Drilled Sheet 1800 x 400 x 12 mm
Material shortage: stock and purchases do not cover the need
Drawer Assembly
22.1 Drawer Chest with 3 Drawers
Operation has no resource in its routing
Serrated Cutting
20.1 Rear Panel 1800 x 400 x 12 mm
Material shortage: stock and purchases do not cover the need
| Plant | Order | Status | Material | Quantity | Yielded | Due Date | Schedule | Constraints | Delivery Status |
|---|
| Material setup | Stock | Outflows | Inflows | Result | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Plant | Material Name | Type | Min. Lot | Safety Stock | Initial Stock | Sales | Forecast | Dependent | Total Outflows | Orders | Purchases | Requisitions | Transfers | Suggested | Total Inflows | Proj. Balance |
Your turn: ask Isa, pick a bar or use Schedule.Monday, 8:10 AM. The plan for the week: one row per resource, one bar per operation.
Trusted by industry leaders






Replans in under 1 second
Real-time optimization algorithms, even for complex factories.
Simulate before you decide
Test capacity, demand and material changes in scenarios, without touching the official plan.
Where your team already works
The same plan in the browser and in Microsoft Teams, with Isa in both.
Ask in the Microsoft Teams chat, on your phone or your computer, without opening Seed APS. The answer comes from the plan in use, with the same math as the screens.
The same queries and simulations, with the permissions of each user.
Test a priority or a rule from your phone. The official scenario stays the same.
To reschedule, Isa prepares the plan and only saves it when you confirm on the card.
Isa, the Seed APS assistant, reads the live plan, answers in the language of production planning and does what you ask.
IsaSeed APS assistant
Which orders are late?
Reading the planPlan read
10 orders finish after their due date. The largest gaps:
| Order | Last resource | Delay |
|---|---|---|
| WO-0919 | Sander | 14 h |
| WO-2640 | Fixed Drill 2 | 12 h |
| WO-7346 | Fixed Drill 2 | 11 h |
What if I schedule by due date?
Simulating on a copy of the scenarioSimulation ready
I simulated the EDD rule on a copy of the official scenario. The official one is unchanged.
Simulation
| FIFO | EDD | |
|---|---|---|
| Late orders | 10 | 7 |
| Orders with tight slack | 26 | 8 |
Prioritize WO-5648 and reschedule.
Scheduling the scenarioPlan rescheduled
Done. WO-5648 now finishes Monday, Nov 23 at 7 PM, on time.
One model of the factory, seen from five distances. What changes in one shows up in the others.
Year · S&OP
Projects revenue, margin and the annual budget for labor, overtime and materials, together with the machine and workforce plan.
Explore the moduleMonth · S&OE
Opens planned orders within capacity, sends them to MRP and tracks executed against planned.
Explore the moduleWeek · MRP
Calculates net requirements across multi-level structures and aligns purchasing with production.
Explore the moduleShift · Scheduling
Sequences operation by operation, considering machine, labor, tooling and material at the same time.
Explore the moduleNow · Shop floor
Each machine shows the order in progress, its queue and what it has produced today. Operators report production and downtime, and the plan adjusts.
Explore the moduleIntegrated from the start, from the customer order to the confirmation at the machine.
Dozens of industrial reports from day one. When one is missing, ask Isa or write your own.
IsaSeed APS assistant
Build an OTIF by customer dashboard for this week.
Generating draft…Draft generated
Weekly OTIF at 91.9%, with 4 of 5 customers below the 95% target.
OTIF by customerWeek 48
PreviewSave| Customer | Delivered | On time | OTIF |
|---|---|---|---|
| Customer A | 42 | 41 | 97.6% |
| Customer B | 36 | 34 | 94.4% |
| Customer C | 28 | 25 | 89.3% |
| Customer D | 24 | 21 | 87.5% |
| Customer E | 18 | 15 | 83.3% |
Two-way sync with ERP, MES, BI and spreadsheets, without months of middleware.
Your systems
Open APIs
Connector built with AI
Send the API documentation, payload samples or the legacy schema. The AI generates the endpoint, maps the fields and publishes the connector.
Create an API endpoint to sync ERP production orders and map XML routing steps to Scheduling.
POST /api/v1/connectors/erp-orders Mining, steel, automotive, glass and plastics, in Brazil and abroad.
We show Seed APS live and answer the technical questions from your planning team.